-
posted Feb?10Case name:? district low-carbon heating and cooling project of Nanjing International Service Outsourcing Park2.Case summary:? this project mainly serves the construction and contract energy management of district cooling and heating project and of Nanjing International Service Outsourcing Park.Evaporator inlet and outlet water temperature is 12.5/5.5℃, flow is 515 m3/h, condenser inlet and outlet water temperature is 29/37℃, flow is 543 m3/h.② Heating condition:heating capacity is 4185.7...
-
posted Aug?31This case focuses on energy storage technologies for future net-zero-carbon smart cities.Attention is then paid to the most popular emerging energy technologies for smart cities, including electrification of transport, hydrogen economy, carbon capture and storage, and AI and information technologies.Finally, a high-level summary of future collaboration with Nanjing is proposed.
-
posted Jul?28
-
posted Jul?28Issues AddressedDelivering the First ever commonwealth games with a carbon neutral legacy, minimising the carbon and climate impact of the event and ensuring a lasting positive legacy.2030.? ? The Games will champion sustainability in its widest sense, embedding the principle of sustainable development throughout the planning, implementation and post games legacy.?.
-
posted Jul?28Since started operation, the three plants produced over 32 TWh.This amount of green energy avoided carbon emissions equivalent to 20000 ton of CO2 ?, when comparing to the production of the same of energy on a typical fossil-fuelled thermal power plant.As no new licenses catering for CPV solar power plants are likely to be issued, the manufacturer is developing the CPV technology to the production of Green Hydrogen(Hydrogen produced without carbon emissions).A Green Hydrogen pilot plant is u...